Home/Services/Structured Cabling Systems

One system,backbone tooutlet.

Complete structured cabling systems, from the backbone to the work area, installed and documented as one coherent whole.

A line of cabinets receding into darkness

Service 06 / Equipment room

01 Why it matters

Cabling added one job at a time becomes a puzzle. Cabling built as a system stays readable for years.

We install the full system for a building or site: the backbone between rooms and floors, the horizontal cabling to each area, and the racks and termination hardware that bring it together.

It is labelled to one scheme and handed over with documentation, so the system can be managed as a whole.

02 When to call

When a buildingneeds a system.

A new building

Construction is under way and the cabling system has to be installed from the ground up.

A full refit

An existing building is being stripped back and recabled.

A patchwork to replace

Years of separate additions have left cabling that cannot be managed.

Several rooms and floors

The project spans equipment rooms and floors that must work as one system.

03 Typical scope

What thework covers.

01

Backbone and horizontal cabling

Backbone cabling links rooms and floors; horizontal cabling reaches each area.

02

Rack and termination hardware

Racks, panels and termination hardware are installed and dressed.

03

System labelling

The whole system is labelled to a single scheme.

04

Handover documentation

Documentation of the installed system is handed over at completion.

04 How we work

Four steps,in order.

  1. Step 01

    Review the design

    We go through the drawings, rooms and routes with the project team.

  2. Step 02

    Build the backbone

    Pathways and backbone cabling are installed first.

  3. Step 03

    Install the horizontal

    Cabling is run to each area and terminated in the racks.

  4. Step 04

    Label and document

    The system is labelled and the documentation completed.

05 When we leave

What youget back.

A

A complete system

Backbone, horizontal cabling and hardware installed as one.

B

One labelling scheme

Every cable, port and panel identified the same way.

C

Handover documentation

A record of the system as it was installed.

06 Questions

Beforeyou ask.

Yes. We install to the design and specification provided by your designer or project team.

Yes. On construction projects the work is sequenced with the general contractor and the other trades on site.

Testing and certification is a separate service that is usually quoted with a system installation, so every link is proven before handover.

07 Related

Often quotedtogether.

Next step Request a quote

Need thison your site?

Tell us the location and what you need. We will come back with next steps.

Request a QuoteSee Our Work