Home/Services/Data Center Cabling

Orderin everyrack.

Orderly, serviceable cabling for racks, rows and rooms, installed with attention to routing, density and the people who will work on it next.

A line of cabinets receding into darkness

Service 09 / Cabinet row

01 Why it matters

In a data center, cabling is either an asset or an obstacle. The difference is decided on installation day.

We cable racks and cabinets, run pathways overhead or underfloor, and build cross-connects and patching that can be followed by eye.

Everything is labelled and documented, so the next change does not start with tracing cables.

02 When to call

When the roomneeds work.

A new room or row

Racks are going in and the cabling needs to be right from day one.

Growth in an existing room

Capacity is being added and new cabling has to fit what is there.

Cabling that cannot be traced

Patching has grown without a plan and changes have become risky.

Preparing for handover

The space needs labelling and documentation before it is signed off.

03 Typical scope

What thework covers.

01

Rack and cabinet cabling

Racks and cabinets are cabled and dressed so equipment can be reached.

02

Overhead and underfloor pathways

Overhead and underfloor pathways are installed and filled in an orderly way.

03

Cross-connects and patching

Cross-connects and patching are built to be read and followed.

04

Labelling and documentation

Every cable and port is labelled and recorded.

04 How we work

Four steps,in order.

  1. Step 01

    Review the layout

    We go through the room, the racks and the routes with you.

  2. Step 02

    Build the pathways

    Routes are installed before any cable is pulled.

  3. Step 03

    Cable and terminate

    Cabling is run, dressed and terminated rack by rack.

  4. Step 04

    Label and document

    Labels and records are completed before handover.

05 When we leave

What youget back.

A

Serviceable racks

Cabling that leaves equipment accessible and airflow clear.

B

Readable patching

Cross-connects that can be followed without tracing.

C

Labels and records

Documentation that matches what is installed.

06 Questions

Beforeyou ask.

Yes. Work in an operating room is planned with you around access rules and change windows.

That depends on the project. Tell us what is being supplied by others and we scope the rest.

Testing and certification is a separate service that is usually quoted together with data center cabling, so links are proven before handover.

07 Related

Often quotedtogether.

Next step Request a quote

Need thison your site?

Tell us the location and what you need. We will come back with next steps.

Request a QuoteSee Our Work

Continue toWireless Network Solutions